Round-the-clock river surveillance, night patrolling, emergency resource mobilisation and field inspections intensified to tackle potential flood threats

 

THEBUSINESSBYTES BUREAU

BHUBANESWAR, NOVEMBER 19, 2026

With Cyclone Akvan approaching and the possibility of heavy rainfall and consequent flooding looming over vulnerable areas, the Odisha Government has stepped up precautionary measures in Gajapati district, placing the Water Resources Department on round-the-clock alert to ensure the safety of lives, property and critical infrastructure. As part of the intensified preparedness strategy, a dedicated 24×7 Flood Control Room has been activated at Jal Sampad Bhawan, Paralakhemundi, by the Gajapati Irrigation Division to facilitate continuous surveillance, seamless inter-departmental coordination and swift response to any emerging flood-related emergency.

As part of the proactive measures, river systems, rainfall patterns and catchment conditions are being closely monitored to assess the potential impact of the cyclone and anticipate possible changes in water levels. The Superintending Engineer, accompanied by field officers and engineers, is undertaking extensive inspections along the Vansadhara and Mahendratanaya river systems and adjoining streams to identify vulnerable stretches, assess the condition of flood protection infrastructure and ensure that necessary safeguards are in place. Night patrolling, round-the-clock river surveillance and watch-and-ward arrangements have also been intensified along embankments and riverbanks to facilitate early detection of any signs of danger and enable immediate intervention.

In a bid to ensure an effective and timely response to any eventuality, emergency flood-fighting materials, including sandbags, empty cement bags, bamboo posts and other essential equipment, have been mobilised and strategically stationed at identified sensitive locations. Field-level teams are simultaneously reaching out to local communities and representatives of Panchayati Raj Institutions (PRIs), sensitising them about the impending weather situation and creating awareness about essential precautionary measures to minimise risks during the cyclone.

The Water Resources Department is also maintaining close and continuous coordination with the District Administration through regular exchange of rainfall records, river gauge readings and field-level assessment reports to ensure timely information-sharing and coordinated decision-making. All officers and staff have been instructed to remain stationed at their respective headquarters and maintain round-the-clock operational readiness to respond promptly to any emergency. Leave and movement restrictions have also been enforced to ensure the uninterrupted availability of personnel and resources throughout the critical period.