THEBUSINESSBYTES BUREAU

ROURKELA, JANUARY 13, 2026

In a significant boost to operational excellence and cost efficiency, SAIL-run Rourkela Steel Plant (RSP) has set a new industry benchmark by achieving an unprecedented steel ladle lining life of 210 heats in its 150-ton steel ladle at the Steel Melting Shop-II (SMS-II). The feat, accomplished in Steel Ladle No. 29, surpasses the previous best of 206 heats recorded in September 2020, underlining RSP’s sustained focus on innovation and process discipline.

The record performance is a testament to the coordinated efforts and unwavering commitment of teams from the Refractory Engineering (Services) Department and SMS-II. It also reflects continuous improvements in refractory performance, operational practices and maintenance protocols adopted at the plant. The steel ladle management system for this record-setting run was supplied by RHI Magnesita India Refractories Ltd. The ladle, lined on October 15, 2025, successfully completed 210 heats before being withdrawn from service on January 11, 2026.

According to plant officials, the enhanced ladle life was achieved through a combination of optimized refractory selection, strict adherence to standard operating procedures during tapping and teeming, effective slag control, improved temperature management and timely maintenance interventions. Close coordination among operations, refractories and maintenance teams played a crucial role in sustaining performance over an extended campaign.

The achievement has delivered tangible business benefits, including reduced refractory consumption, higher ladle availability, lower operational downtime and improved workplace safety. Together, these gains significantly enhance the reliability and cost efficiency of steelmaking operations at Rourkela Steel Plant, reinforcing its position as a leader in operational excellence within India’s steel sector.