THEBUSINESSBYTES
BUREAU
KALINGANAGAR,
OCTOBER 14, 2026
Odisha Chief Minister
Mohan Charan Majhi on Wednesday inaugurated key manufacturing facilities at
Tata Steel Kalinganagar and launched the expansion of Neelachal Ispat Nigam Ltd
(NINL), involving a cumulative investment of Rs 9,067 crore and expected to
generate 10,500 direct and indirect employment opportunities.
The projects in
Jajpur district include two continuous galvanising lines, a continuous
annealing line, the first phase of a 7-million-tonne-per-annum (MTPA) slurry
pipeline, and an air separation unit, alongside modernisation and capacity
enhancement initiatives at NINL.
The investments are
expected to strengthen Odisha's steel manufacturing ecosystem, enhance
value-added steel production and improve raw material logistics, while
supporting regional industrial development.
The two continuous
galvanising lines at Tata Steel Kalinganagar have a combined capacity of 1
MTPA, while the continuous annealing line has a capacity of 0.9 MTPA. The
facilities are designed to produce high-quality automotive steel, including
coated Advanced High Strength Steel (AHSS), catering to the requirements of the
automobile and appliances sectors.
Equipped with
advanced coating technologies, including a third-generation air knife with a
magnetic stabiliser, an oxidation chamber and specialised secondary coatings,
the galvanising lines are expected to improve product consistency and
reliability.
The continuous
annealing line, designed to meet evolving automotive industry requirements,
will further strengthen Tata Steel's capability to manufacture
precision-engineered, value-added steel products for the domestic market.
The first phase of
the 7 MTPA slurry pipeline will transport iron ore fines from the company's
Kalamang mine to its Kalinganagar plant through an underground network. The
project is expected to ensure a steady supply of raw materials, reduce pressure
on road and rail infrastructure and lower transportation-related emissions.
A new air separation
unit set up by Linde India Ltd for Tata Steel Kalinganagar was also
inaugurated. The facility, with two units of 1,800 tonnes per day each, will
produce 3,600 tonnes of oxygen, 1,940 tonnes of nitrogen and 120 tonnes of
argon daily through cryogenic distillation.
Oxygen from the
facility can also be used for medical purposes during emergencies, while the
unit will support the steel plant's continuous and efficient operations.
The NINL expansion
project will focus on modernisation and technological upgrades, incorporating
measures aimed at improving environmental performance. These include a blast
furnace fume extraction system and zero-effluent-discharge measures to support
more sustainable steelmaking operations.
The projects form
part of Tata Steel's broader investment strategy to expand manufacturing
capabilities, improve operational efficiency and integrate sustainability
measures into its steel production network in Odisha.
The company said its
approach also encompasses low-carbon technologies, circular resource management
and corporate social responsibility initiatives aimed at supporting inclusive
community development and long-term socio-economic growth.
Among those present at the inauguration were Jajpur MP Rabindra Narayan Behera, Industries, Skill Development and Technical Education Minister Sampad Chandra Swain, Cooperation, Handlooms, Textiles and Handicrafts Minister Pradeep Bal Samanta, and MLAs Himanshu Sekhar Sahoo, Akash Dasnayak and Amar Kumar Nayak.
Odisha Chief Secretary Anu Garg, Additional Chief Secretary Hemant Sharma, Jajpur District Magistrate Ambar Kumar Kar and Tata Steel Vice President (Engineering and Projects) Akshay Khullar were also present, along with senior officials of Tata Steel and NINL.